Mont Blanc Motorways and Tunnel Mont Blanc Motorways and Tunnel

Contact us

Works : traffic informations

Roadworks

- Vuache tunnel + Bellegarde / Saint Julien en Genevois - from Monday 23 to Friday 27 - in both ways :
. Maintenance works in the tunnel (control of all security equipments and lightning systems) + road coating between both interchanges nr. 10 (Bellegarde) and nr. 13 (Saint Julien en G.).
. Works at night.

. Circulation : A40 closed to traffic between both interchanges in both ways of circulation, during the nights of March 23, 24, 25 and 26, from 8:30 pm to 6 am. Interchange nr. 11 (Eloise) closed to traffic during the works.
Alternative routes S1 and S2 activated.

- As for toll rates, the Ministry of Ecology, the Ministry of Sustainable development and Energy, which we depend on, do not authorize us to lower the toll rates which are fixed by their departments. Learn more on toll rates


Infos pratiques

For information on traffic management :

Free call, Monday to Friday, from 7:00 a.m. to 7:30 p.m. and on Saturday, from 8:30 a.m. to 5:00 p.m.

- Autoroute Info FM 107.7